Case Study: MCPS - PRS
"We have an overnight batch window in which to process batch jobs, all controlled by the scheduling software. We commonly experienced tape problems. All together, we're really pleased with the solution and the quality of support we're receiving from both Quantum and Cognitive."
Terry Rumsey ISG Project Manager
Download PDF |
Case Study: The Mill Tandberg Data The Challenge
Real time video editing dictated that each of the 14 editing suites required large amounts of expensive local disk storage, totalling more than 40TB, all of which needed to be archived to tape. The challenge was magnified by the fact that each suite’s Intel-based server hardware was already full of video input/output cards, so any storage system could only use the pre-installed Fibre Channel expansion cards.
To address this problem, Cognitive Network Solutions, the trusted storage advisor to The Mill, advised them to install direct-attached storage onto very fast tape drives. By deploying the latest generation of LTO-4 tape drives attached to each editing suite, they suggested that The Mill could realize near realtime speed to facilitate the archiving process and, as an added bonus, achieve the best value for the money.
Download PDF |
Case Study: Moving Picture Company - Veritas "We have doubled our data every 18 months and now have in the region of 100tb of total storage.
Solutions understood EXACTLY what we were aiming to achieve and our technology. They are highly professional, reasonable to work with and I TRUST their advice."
Nick Cannon Head of Technology, MPC
Download PDF |
|
|